Back from a short break and straight into it. Before I left I’d started building the paper skeleton, and I’ve now added the sections that were already written the abstract, introduction, related work, and methodology all pull from research I’d done earlier, so a good chunk of the paper is already down.


Sent it over to Trevor on OneDrive so he can leave comments while I get on with the rest. Going with the ACM DIS format since it’s an actual design conference and fits the project better than a standard academic template.


Next up is the interim presentation on the 6th pulling together everything done so far into a quick 5-minute overview.

 
 
 